Project: mhlRV14A   -  
            Listing for Category : 19 Sys Route
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Mark Larsen   -  
Project:   Vans - RV-14A
Total Hours:1661.5
Total Flight Time:
Start/Last Date:Sep 21, 2020 - No Finish Date
Engine:Lycoming YIO-390-EXP119 (YENPL-RT2E11172)
 
Friendly URL: https://eaabuilderslog.org?s=mhlRV14A

Home or Last Project Picture

Jan 03, 2023     19-04 - Pitot Tube Installation - (1.1 hours)       Category: 19 Sys Route
1/3 /22 – 1.1h
I am going to install a Garmin GAP 26 heated (unregulated) pitot probe instead of the pitot tube supplied with the wing kit. Most of the modifications related to the after-market pitot probe will happen when I work on the bottom wing skins, so the only thing to do now is route the pitot and AoA tubing in the left wing. I made a path for the lines through the ribs before I attached the ribs to the spar. The idea was to route the pitot and AoA lines as close to the top wing skin as possible to avoid potentially getting water in the lines. The pitot probe has drain holes built in, so the likelihood of getting water through the probe and all the way up to the top of the wing should be pretty remote. I plan to install the pitot probe near the same location as the wing kit pitot tube, so I ran the pitot and AoA lines to that point in the wing.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.